3: Jiggle the Handle

terminal 0

unfinished

Derringer Interface Control Software

Final broadcast range interrupted: Local generating facility off-line. Manual restart required. Diagnostic run: Hydraulic line static. Awaiting manual adjustments. Problem areas follow:

<checkpoint 1>

Over flow gate is in closed position. Open position is required for online operations of local generating facility

<checkpoint 2>

Main reserve tanks are full. Main reserve tanks must be drained to replenish hydraulic line Open position is required for online operations of local generating facility

<checkpoint 3>

Pumps are inactive. Pumps must be activated to refresh hydraulic line. Open position is required for online operations of local generating facility

Derringer Interface Control Software

success

Derringer Interface Control Software

Overflow gate is in open position. Hydraulic line connected to main reserve tanks. Main reserve tanks drained. Final broadcast range interrupted: Local generating facility off-line. Manual restart required. Diagnostic run: Hydraulic line static. Awaiting manual adjustments. Problem areas follow:

<checkpoint 3>

Pumps are inactive. Pumps must be activated to refresh hydraulic line. Open position is required for online operations of local generating facility

Derringer Interface Control Software

terminal 1

unfinished

Derringer Interface Control Software

Main reserve tanks query~ Main reserve tanks in bypass. Main reserve tanks are full.

Derringer Interface Control Software

success

Derringer Interface Control Software

Main reserve tanks query~ Hydraulic line connected to main reserve tanks. Main reserve tanks drained.

Derringer Interface Control Software

terminal 2

unfinished

Derringer Interface Control Software

Main shielding unit has been activated. Initiating first burst. Primary umbrella phase. Tertiary phase beginning. Final burst to follow. Cation: All signals will be blocked after Tertiary phase.

Derringer Interface Control Software